2022 ROADWAY PAVING & RECONSTUCTION PROJECT - PHASE I
Bid Location
Category
Bid Date
1 | REMOVE & REPLACE EXISTING UNDERSIZED FIRE HYDRANT | UNIT | 3 | $9,800.00 | $29,400.00 | $7,769.15 | $23,307.45 | $10,000.00 | $30,000.00 | $15,000.00 | $45,000.00 |
2 | REMOVE, REPLACE & RESET EXISTING WATER SERVICE CURB BOX, AS DIRECTED BY THE ENGINEER | UNIT | 90 | $1,450.00 | $130,500.00 | $2,188.92 | $197,002.80 | $700.00 | $63,000.00 | $1,200.00 | $108,000.00 |
3 | FURN. & INST. NEW 1" WATER SERVICE WITH NEW CURB STOP/BOX & PROVIDE CONNECTIONS TO EXISTING SERVICE & EXISTING WATER MAIN, AS DIRECTED BY THE ENGINEER | UNIT | 4 | $2,900.00 | $11,600.00 | $0.01 | $0.04 | $3,000.00 | $12,000.00 | $3,200.00 | $12,800.00 |
4 | ABANDON EXISTING WATER SERVICE AS DIRECTED BY THE ENGINEER | UNIT | 4 | $2,170.00 | $8,680.00 | $0.01 | $0.04 | $2,000.00 | $8,000.00 | $2,500.00 | $10,000.00 |
5 | CUT & REMOVE EXISTING ASPHALT OR ASPHALT / REINFORCED CONCRETE ROADWAY PAVEMENT UP TO TWENTY-FOUR (24") INCHES DEEP, AS DIRECTED BY THE ENGINEER | SY | 300 | $15.00 | $4,500.00 | $0.01 | $3.00 | $80.00 | $24,000.00 | $100.00 | $30,000.00 |
6 | ROADWAY MILLING OF EXISTING ASPHALT SURFACE / BASE COURSE PAVEMENT, VARIABLE THICKNESS, AS DIRECTED BY THE ENGINEER | SY | 16,500 | $6.00 | $99,000.00 | $3.20 | $52,800.00 | $9.00 | $148,500.00 | $5.00 | $82,500.00 |
7 | FURN. & INST. 6" THICK NJDOT DGA ROADWAY SUB-BASE, AS DIRECTED BY THE ENGINEER | CY | 50 | $31.00 | $1,550.00 | $0.01 | $0.50 | $80.00 | $4,000.00 | $50.00 | $2,500.00 |
8 | FURN. & INST. HMA BASE COURSE, MIX 19M64 FOR BASE PAVEMENT RESTORATION, AS DIRECTED BY THE ENGINEER | TON | 100 | $112.00 | $11,200.00 | $0.01 | $1.00 | $112.00 | $11,200.00 | $120.00 | $12,000.00 |
9 | FURN. & INST. HMA LEVELING & SURFACE COURSE, MIX 9.5M64 TO BRING PAVEMENT TO FINAL GRADE, AS DIRECTED BY THE ENGINEER | TON | 1,800 | $97.08 | $174,744.00 | $102.08 | $183,744.00 | $110.00 | $198,000.00 | $115.00 | $207,000.00 |
10 | ALLOWANCE FOR ASPHALT & FUEL PRICE ADJUSTMENT | ALLOWANCE | 1 | $15,000.00 | $15,000.00 | $15,000.00 | $15,000.00 | $15,000.00 | $15,000.00 | $15,000.00 | $15,000.00 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
10 | Maintenance and Protection of Traffic | LS | 11 | 12 | 13 | 14 | 15 | 14 | 15 | 14 | 15 |
$540,242.00 | $516,605.01 | $576,900.00 | $605,000.00 |