2019 COUNTY AID ROAD PROGRAM
Bid Location
Category
Bid Date
1 | MOBILIZATION | LS | 1 | $349,000.00 | $349,000.00 | $280,000.00 | $280,000.00 | $200,000.00 | $200,000.00 |
2 | Construction Layout | LS | 1 | $6,750.00 | $6,750.00 | $5,000.00 | $5,000.00 | $10,250.00 | $10,250.00 |
3 | Temporary Soil Erosion and Sediment Control | LS | 1 | $5,000.00 | $5,000.00 | $1.00 | $1.00 | $5,000.00 | $5,000.00 |
4 | CLEARING SITE | LS | 1 | $20,700.00 | $20,700.00 | $60,000.00 | $60,000.00 | $1,000.00 | $1,000.00 |
5 | Construction Signs | SF | 1,000 | $15.00 | $15,000.00 | $0.01 | $10.00 | $0.01 | $10.00 |
6 | Traffic Cones | UNIT | 100 | $13.20 | $1,320.00 | $0.01 | $1.00 | $0.01 | $1.00 |
7 | Drums | UNIT | 50 | $20.00 | $1,000.00 | $0.01 | $0.50 | $0.01 | $0.50 |
8 | BREAKAWAY BARRICADES | UNIT | 50 | $40.00 | $2,000.00 | $0.01 | $0.50 | $0.01 | $0.50 |
9 | Traffic Director / Flagger | HOURS | 300 | $83.30 | $24,990.00 | $83.28 | $24,984.00 | $83.28 | $24,984.00 |
10 | Flashing Arrow Board, 4' x 8' | UNIT | 2 | $1,200.00 | $2,400.00 | $1.00 | $2.00 | $1,200.00 | $2,400.00 |
11 | Traffic Control Truck with Mounted Crash Cushion | UNIT | 2 | $5,000.00 | $10,000.00 | $10.00 | $20.00 | $3,500.00 | $7,000.00 |
12 | Hot Mix Asphalt Milling, 3" or Less | SY | 115,500 | $2.50 | $288,750.00 | $3.25 | $375,375.00 | $3.00 | $346,500.00 |
13 | Dense Graded Aggregate, 4" Thick | SY | 300 | $10.00 | $3,000.00 | $0.01 | $3.00 | $0.01 | $3.00 |
14 | Hot Mix Asphalt Pavement Repair (25M64 Base Course, 5" Thick) | SY | 6,500 | $16.60 | $107,900.00 | $0.50 | $3,250.00 | $0.01 | $65.00 |
15 | Hot Mix Asphalt 12.5M64 Surface Course, 2 1/2" Thick | SY | 115,500 | $13.50 | $1,559,250.00 | $13.00 | $1,501,500.00 | $13.56 | $1,566,180.00 |
16 | HOT MIX ASPHALT 12.5M64 LEVELING COURSE, VARIABLE THICKNESS | TON | 2,000 | $3.00 | $6,000.00 | $0.01 | $20.00 | $0.01 | $20.00 |
17 | Hot Mix Asphalt 12.5M64 Surface Course, 3" Thick (Driveways) | SY | 1,000 | $43.50 | $43,500.00 | $50.00 | $50,000.00 | $70.00 | $70,000.00 |
18 | Replacement Concrete Driveway Apron, 6" thick (Reinforced) | SY | 200 | $110.00 | $22,000.00 | $125.00 | $25,000.00 | $162.00 | $32,400.00 |
19 | Replacement Concrete Vertical Curb | LF | 1,750 | $39.10 | $68,425.00 | $50.00 | $87,500.00 | $107.00 | $187,250.00 |
20 | Replacement Monolithic Concrete Curb and Gutter | LF | 750 | $60.00 | $45,000.00 | $70.00 | $52,500.00 | $103.00 | $77,250.00 |
21 | TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC, 4" WIDE | LF | 63,000 | $0.66 | $41,580.00 | $0.61 | $38,430.00 | $0.61 | $38,430.00 |
22 | Traffic Stripes, Long Life, Thermoplastic, 8" wide | LF | 1,725 | $1.62 | $2,794.50 | $1.80 | $3,105.00 | $1.80 | $3,105.00 |
23 | Traffic Stripes, Long Life,
Thermoplastic, 24" Wide | LF | 800 | $5.41 | $4,328.00 | $5.40 | $4,320.00 | $5.40 | $4,320.00 |
24 | Traffic Stripes, Long Life, Thermoplastic, 6" wide | LF | 31,500 | $1.10 | $34,650.00 | $0.79 | $24,885.00 | $0.79 | $24,885.00 |
25 | Bi-Directional Raised Pavement Markers | UNIT | 500 | $36.80 | $18,400.00 | $30.00 | $15,000.00 | $29.40 | $14,700.00 |
26 | RESET CASTING | UNIT | 20 | $398.00 | $7,960.00 | $0.01 | $0.20 | $300.00 | $6,000.00 |
27 | RESET WATER VALVE BOXES | UNIT | 39 | $35.00 | $1,365.00 | $0.01 | $0.39 | $51.00 | $1,989.00 |
28 | Inlet Head, Type "N-ECO" | UNIT | 39 | $365.00 | $14,235.00 | $300.00 | $11,700.00 | $541.00 | $21,099.00 |
29 | Bicycle Safe Grate | UNIT | 33 | $361.00 | $11,913.00 | $350.00 | $11,550.00 | $446.00 | $14,718.00 |
30 | Inlet / Manhole Repair | UNIT | 60 | $800.00 | $48,000.00 | $75.00 | $4,500.00 | $1,102.00 | $66,120.00 |
31 | Regulatory and Warning Signs | SF | 650 | $45.00 | $29,250.00 | $44.00 | $28,600.00 | $44.00 | $28,600.00 |
32 | Sawing and Sealing Joints in Bituminous Concrete Overlay | LF | 37,500 | $3.00 | $112,500.00 | $2.40 | $90,000.00 | $2.79 | $104,625.00 |
33 | Replacement Beam Guide Rail, Complete | LF | 5,300 | $35.00 | $185,500.00 | $26.00 | $137,800.00 | $30.50 | $161,650.00 |
34 | Rumble Strips, Thermoplastic | LF | 300 | $0.95 | $285.00 | $0.80 | $240.00 | $0.80 | $240.00 |
35 | Replacement Signs | UNIT | 50 | $440.00 | $22,000.00 | $230.00 | $11,500.00 | $230.00 | $11,500.00 |
36 | Tangent Guide Rail Terminal | UNIT | 25 | $3,600.00 | $90,000.00 | $3,465.00 | $86,625.00 | $3,475.00 | $86,875.00 |
37 | Replacement Concrete Header | LF | 250 | $41.30 | $10,325.00 | $40.00 | $10,000.00 | $91.00 | $22,750.00 |
38 | Driveway Restoration, Stone (In-Kind) | SY | 100 | $25.00 | $2,500.00 | $30.00 | $3,000.00 | $80.00 | $8,000.00 |
39 | Turf Repair Strip, 4" Depth (4' Wide) | SY | 16,500 | $1.00 | $16,500.00 | $0.10 | $1,650.00 | $0.01 | $165.00 |
40 | Rip Rap D50=6" (12" Thick) | SY | 700 | $50.00 | $35,000.00 | $70.00 | $49,000.00 | $39.00 | $27,300.00 |
41 | Replacement Concrete Sidewalk, 4" thick | SY | 1,000 | $90.40 | $90,400.00 | $110.00 | $110,000.00 | $176.00 | $176,000.00 |
42 | Detectable Warning Surface | SY | 50 | $265.00 | $13,250.00 | $250.00 | $12,500.00 | $470.00 | $23,500.00 |
43 | PAVEMENT MARKINGS | SF | 1,000 | $7.25 | $7,250.00 | $7.25 | $7,250.00 | $7.25 | $7,250.00 |
44 | Pavement Markings (Bicycle Symbol) | UNIT | 26 | $150.00 | $3,900.00 | $533.00 | $13,858.00 | $533.00 | $13,858.00 |
45 | Sign and Post (D11-1) | UNIT | 4 | $237.00 | $948.00 | $275.00 | $1,100.00 | $275.00 | $1,100.00 |
46 | Concrete Sidewalk, 4" Thick | SY | 150 | $97.50 | $14,625.00 | $110.00 | $16,500.00 | $176.00 | $26,400.00 |
47 | Sign and Post (W10-1) | UNIT | 2 | $237.00 | $474.00 | $275.00 | $550.00 | $275.00 | $550.00 |
48 | Rapid Rectangular Flashing Beacon | UNIT | 4 | $12,200.00 | $48,800.00 | $10,000.00 | $40,000.00 | $9,548.00 | $38,192.00 |
49 | Beam Guide Rail, Bridge | LF | 850 | $80.00 | $68,000.00 | $59.50 | $50,575.00 | $104.00 | $88,400.00 |
50 | Tree Removal, 24" to 36" Diameter | UNIT | 2 | $2,500.00 | $5,000.00 | $2,200.00 | $4,400.00 | $2,500.00 | $5,000.00 |
51 | Final Clean-up | LS | 1 | $1,000.00 | $1,000.00 | $1.00 | $1.00 | $1,000.00 | $1,000.00 |
52 | Asphalt Price Adjustment | DOLLAR | 1 | $151,000.00 | $151,000.00 | $151,100.00 | $151,100.00 | $151,100.00 | $151,100.00 |
53 | Fuel Price Adjustment | DOLLAR | 1 | $75,100.00 | $75,100.00 | $75,100.00 | $75,100.00 | $75,100.00 | $75,100.00 |
54 | Controlled Release Terminal | UNIT | 1 | $1,600.00 | $1,600.00 | $2,000.00 | $2,000.00 | $1,865.00 | $1,865.00 |
55 | Controlled Release Terminal Anchorage | UNIT | 1 | $2,200.00 | $2,200.00 | $2,000.00 | $2,000.00 | $2,625.00 | $2,625.00 |
56 | BEAM GUIDE RAIL POSTS | UNIT | 15 | $90.00 | $1,350.00 | $75.00 | $1,125.00 | $71.00 | $1,065.00 |
57 | Beam Guide Rail Posts, 8' Long | UNIT | 15 | $90.00 | $1,350.00 | $105.00 | $1,575.00 | $23.00 | $345.00 |
58 | MOBILIZATION | LS | 1 | $349,000.00 | $349,000.00 | $100,000.00 | $100,000.00 | $35,000.00 | $35,000.00 |
59 | Construction Layout | LS | 1 | $2,000.00 | $2,000.00 | $1.00 | $1.00 | $2,000.00 | $2,000.00 |
60 | Temporary Soil Erosion and Sediment Control | LS | 1 | $1,500.00 | $1,500.00 | $1.00 | $1.00 | $1,500.00 | $1,500.00 |
61 | CLEARING SITE | LS | 1 | $2,000.00 | $2,000.00 | $5,000.00 | $5,000.00 | $500.00 | $500.00 |
62 | Construction Signs | SF | 300 | $15.00 | $4,500.00 | $0.01 | $3.00 | $0.01 | $3.00 |
63 | Traffic Cones | UNIT | 100 | $13.20 | $1,320.00 | $0.01 | $1.00 | $0.01 | $1.00 |
64 | Drums | UNIT | 50 | $20.00 | $1,000.00 | $0.01 | $0.50 | $0.01 | $0.50 |
65 | BREAKAWAY BARRICADES | UNIT | 50 | $40.00 | $2,000.00 | $0.01 | $0.50 | $0.01 | $0.50 |
66 | Traffic Director / Flagger | HOURS | 80 | $83.30 | $6,664.00 | $83.28 | $6,662.40 | $83.28 | $6,662.40 |
67 | Flashing Arrow Board, 4' x 8' | UNIT | 2 | $1,200.00 | $2,400.00 | $1.00 | $2.00 | $1,000.00 | $2,000.00 |
68 | Traffic Control Truck with Mounted Crash Cushion | UNIT | 2 | $5,000.00 | $10,000.00 | $10.00 | $20.00 | $1,000.00 | $2,000.00 |
69 | Hot Mix Asphalt Milling, 3" or Less | SY | 64,500 | $2.50 | $161,250.00 | $2.50 | $161,250.00 | $1.50 | $96,750.00 |
70 | Dense Graded Aggregate, 4" Thick | SY | 300 | $10.00 | $3,000.00 | $0.01 | $3.00 | $0.01 | $3.00 |
71 | Hot Mix Asphalt Pavement Repair (25M64 Base Course, 5" Thick) | SY | 700 | $26.70 | $18,690.00 | $0.01 | $7.00 | $0.01 | $7.00 |
72 | Hot Mix Asphalt 12.5M64 Surface Course, 2 1/2" Thick | SY | 64,500 | $11.00 | $709,500.00 | $12.00 | $774,000.00 | $12.69 | $818,505.00 |
73 | HOT MIX ASPHALT 12.5M64 LEVELING COURSE, VARIABLE THICKNESS | TON | 75 | $101.00 | $7,575.00 | $150.00 | $11,250.00 | $0.01 | $0.75 |
74 | Hot Mix Asphalt 12.5M64 Surface Course, 3" Thick (Driveways) | SY | 1,600 | $42.90 | $68,640.00 | $50.00 | $80,000.00 | $69.00 | $110,400.00 |
75 | Replacement Concrete Driveway Apron, 6" thick (Reinforced) | SY | 8 | $110.00 | $880.00 | $300.00 | $2,400.00 | $298.00 | $2,384.00 |
76 | Replacement Monolithic Concrete Curb and Gutter | LF | 300 | $60.00 | $18,000.00 | $70.00 | $21,000.00 | $104.00 | $31,200.00 |
77 | TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC, 4" WIDE | LF | 39,500 | $0.72 | $28,440.00 | $0.56 | $22,120.00 | $0.56 | $22,120.00 |
78 | Traffic Stripes, Long Life, Thermoplastic, 8" wide | LF | 100 | $2.21 | $221.00 | $1.80 | $180.00 | $1.80 | $180.00 |
79 | Traffic Stripes, Long Life,
Thermoplastic, 24" Wide | LF | 200 | $6.40 | $1,280.00 | $5.40 | $1,080.00 | $5.40 | $1,080.00 |
80 | Traffic Stripes, Long Life, Thermoplastic, 6" wide | LF | 42,500 | $1.05 | $44,625.00 | $0.78 | $33,150.00 | $0.78 | $33,150.00 |
81 | Bi-Directional Raised Pavement Markers | UNIT | 350 | $36.80 | $12,880.00 | $30.00 | $10,500.00 | $29.40 | $10,290.00 |
82 | RESET CASTING | UNIT | 2 | $765.00 | $1,530.00 | $1.00 | $2.00 | $309.00 | $618.00 |
83 | Inlet Head, Type "N-ECO" | UNIT | 20 | $371.00 | $7,420.00 | $300.00 | $6,000.00 | $541.00 | $10,820.00 |
84 | Bicycle Safe Grate | UNIT | 33 | $361.00 | $11,913.00 | $350.00 | $11,550.00 | $446.00 | $14,718.00 |
85 | Inlet / Manhole Repair | UNIT | 35 | $800.00 | $28,000.00 | $75.00 | $2,625.00 | $1,101.00 | $38,535.00 |
86 | Regulatory and Warning Signs | SF | 175 | $45.00 | $7,875.00 | $44.00 | $7,700.00 | $44.00 | $7,700.00 |
87 | Replacement Signs | UNIT | 10 | $440.00 | $4,400.00 | $230.00 | $2,300.00 | $230.00 | $2,300.00 |
88 | Turf Repair Strip, 4" Depth (4' Wide) | SY | 15,500 | $1.00 | $15,500.00 | $0.10 | $1,550.00 | $0.01 | $155.00 |
89 | Replacement Concrete Sidewalk, 4" thick | SY | 100 | $99.10 | $9,910.00 | $110.00 | $11,000.00 | $176.00 | $17,600.00 |
90 | Detectable Warning Surface | SY | 4 | $312.00 | $1,248.00 | $250.00 | $1,000.00 | $446.00 | $1,784.00 |
91 | PAVEMENT MARKINGS | SF | 50 | $7.25 | $362.50 | $7.25 | $362.50 | $7.25 | $362.50 |
92 | Final Clean-up | LS | 1 | $500.00 | $500.00 | $1.00 | $1.00 | $500.00 | $500.00 |
93 | Asphalt Price Adjustment | DOLLAR | 1 | $71,400.00 | $71,400.00 | $71,400.00 | $71,400.00 | $71,400.00 | $71,400.00 |
94 | Fuel Price Adjustment | DOLLAR | 1 | $36,900.00 | $36,900.00 | $36,900.00 | $36,900.00 | $36,900.00 | $36,900.00 |
95 | MOBILIZATION | LS | 1 | $349,000.00 | $349,000.00 | $75,000.00 | $75,000.00 | $30,000.00 | $30,000.00 |
96 | Construction Layout | LS | 1 | $400.00 | $400.00 | $100.00 | $100.00 | $1,000.00 | $1,000.00 |
97 | Temporary Soil Erosion and Sediment Control | LS | 1 | $500.00 | $500.00 | $1.00 | $1.00 | $500.00 | $500.00 |
98 | CLEARING SITE | LS | 1 | $2,330.00 | $2,330.00 | $6,000.00 | $6,000.00 | $500.00 | $500.00 |
99 | Construction Signs | SF | 300 | $15.00 | $4,500.00 | $0.01 | $3.00 | $0.01 | $3.00 |
100 | Traffic Cones | UNIT | 100 | $13.20 | $1,320.00 | $0.01 | $1.00 | $0.01 | $1.00 |
101 | Drums | UNIT | 50 | $20.00 | $1,000.00 | $0.01 | $0.50 | $0.01 | $0.50 |
102 | BREAKAWAY BARRICADES | UNIT | 50 | $40.00 | $2,000.00 | $0.01 | $0.50 | $0.01 | $0.50 |
103 | Traffic Director / Flagger | HOURS | 80 | $83.30 | $6,664.00 | $83.28 | $6,662.40 | $83.28 | $6,662.40 |
104 | Flashing Arrow Board, 4' x 8' | UNIT | 2 | $1,200.00 | $2,400.00 | $1.00 | $2.00 | $100.00 | $200.00 |
105 | Traffic Control Truck with Mounted Crash Cushion | UNIT | 2 | $5,000.00 | $10,000.00 | $10.00 | $20.00 | $100.00 | $200.00 |
106 | Hot Mix Asphalt Milling, 3" or Less | SY | 54,000 | $2.50 | $135,000.00 | $3.00 | $162,000.00 | $2.05 | $110,700.00 |
107 | Dense Graded Aggregate, 4" Thick | SY | 300 | $10.00 | $3,000.00 | $0.01 | $3.00 | $0.01 | $3.00 |
108 | Hot Mix Asphalt Pavement Repair (25M64 Base Course, 5" Thick) | SY | 1,700 | $22.30 | $37,910.00 | $0.01 | $17.00 | $0.01 | $17.00 |
109 | Hot Mix Asphalt 12.5M64 Surface Course, 2 1/2" Thick | SY | 54,000 | $12.30 | $664,200.00 | $12.00 | $648,000.00 | $13.48 | $727,920.00 |
110 | HOT MIX ASPHALT 12.5M64 LEVELING COURSE, VARIABLE THICKNESS | TON | 75 | $101.00 | $7,575.00 | $150.00 | $11,250.00 | $0.01 | $0.75 |
111 | TRAFFIC STRIPES, LONG LIFE, THERMOPLASTIC, 4" WIDE | LF | 16,000 | $0.85 | $13,600.00 | $0.56 | $8,960.00 | $0.56 | $8,960.00 |
112 | Traffic Stripes, Long Life, Thermoplastic, 8" wide | LF | 500 | $1.87 | $935.00 | $1.80 | $900.00 | $1.80 | $900.00 |
113 | Traffic Stripes, Long Life,
Thermoplastic, 24" Wide | LF | 300 | $6.10 | $1,830.00 | $5.40 | $1,620.00 | $5.40 | $1,620.00 |
114 | Traffic Stripes, Long Life, Thermoplastic, 6" wide | LF | 30,000 | $1.11 | $33,300.00 | $0.78 | $23,400.00 | $0.78 | $23,400.00 |
115 | Bi-Directional Raised Pavement Markers | UNIT | 250 | $36.80 | $9,200.00 | $30.00 | $7,500.00 | $29.40 | $7,350.00 |
116 | Inlet Head, Type "N-ECO" | UNIT | 5 | $382.00 | $1,910.00 | $300.00 | $1,500.00 | $541.00 | $2,705.00 |
117 | Bicycle Safe Grate | UNIT | 5 | $382.00 | $1,910.00 | $350.00 | $1,750.00 | $446.00 | $2,230.00 |
118 | Inlet / Manhole Repair | UNIT | 5 | $800.00 | $4,000.00 | $75.00 | $375.00 | $1,101.00 | $5,505.00 |
119 | Regulatory and Warning Signs | SF | 250 | $45.00 | $11,250.00 | $44.00 | $11,000.00 | $44.00 | $11,000.00 |
120 | Replacement Beam Guide Rail, Complete | LF | 200 | $44.00 | $8,800.00 | $30.00 | $6,000.00 | $40.00 | $8,000.00 |
121 | Rumble Strips, Thermoplastic | LF | 500 | $0.95 | $475.00 | $0.80 | $400.00 | $0.80 | $400.00 |
122 | Replacement Signs | UNIT | 40 | $440.00 | $17,600.00 | $230.00 | $9,200.00 | $230.00 | $9,200.00 |
123 | Tangent Guide Rail Terminal | UNIT | 2 | $4,090.00 | $8,180.00 | $3,850.00 | $7,700.00 | $3,475.00 | $6,950.00 |
124 | Turf Repair Strip, 4" Depth (4' Wide) | SY | 12,250 | $1.00 | $12,250.00 | $0.10 | $1,225.00 | $0.01 | $122.50 |
125 | PAVEMENT MARKINGS | SF | 1,200 | $7.25 | $8,700.00 | $7.25 | $8,700.00 | $7.25 | $8,700.00 |
126 | Pavement Markings (Bicycle Symbol) | UNIT | 12 | $150.00 | $1,800.00 | $533.00 | $6,396.00 | $533.00 | $6,396.00 |
127 | Final Clean-up | LS | 1 | $100.00 | $100.00 | $1.00 | $1.00 | $100.00 | $100.00 |
128 | Asphalt Price Adjustment | DOLLAR | 1 | $62,100.00 | $62,100.00 | $62,100.00 | $62,100.00 | $62,100.00 | $62,100.00 |
129 | Fuel Price Adjustment | DOLLAR | 1 | $32,000.00 | $32,000.00 | $32,000.00 | $32,000.00 | $32,000.00 | $32,000.00 |
$6,869,380.00 | $5,967,515.89 | $6,245,211.30 |